PMP key terms
People
- Vision statement
- A short, inspiring description of the future the project will create. The PM uses it to align the team and stakeholders on why the work matters. Read the chapter
- Servant leadership
- A leadership style that puts the team first: removing obstacles, shielding the team, coaching and supporting rather than commanding. The default leadership style on the exam for agile and high-trust teams. Read the chapter
- Shared purpose
- A common understanding, across team and stakeholders, of what the project is for. When subgroups drift apart, re-anchoring them to the shared purpose is usually the PM's first move. Read the chapter
- Withdraw/Avoid
- Retreating from or postponing a conflict. Only appropriate when emotions need to cool or the issue is trivial — it doesn't resolve anything. Read the chapter
- Smooth/Accommodate
- Emphasising agreement and conceding on minor points to keep harmony. Protects the relationship but leaves the real issue unresolved. Read the chapter
- Compromise
- Each side gives something up to reach a decision (lose–lose). Quick, but rarely the best answer when there's time to collaborate. Read the chapter
- Force/Direct
- Imposing one view through authority (win–lose). Reserve it for emergencies, safety or truly non-negotiable issues — it damages trust. Read the chapter
- Collaborate/Problem-solve
- Working through the disagreement openly to reach a solution that includes both viewpoints (win–win). The preferred approach on the exam when there's time. Read the chapter
- Situational leadership
- Adapting your leadership style to the team's maturity and the task: directing → coaching → supporting → delegating as competence and commitment grow (Hersey-Blanchard). Read the chapter
- Directing vs. coaching
- Directing gives clear instructions to a new or inexperienced team; coaching explains decisions and builds skills as the team develops. Match the style to the team, not to your preference. Read the chapter
- Maslow
- Maslow's hierarchy of needs: physiological, safety, belonging, esteem, self-actualisation. Higher needs motivate only once lower ones are met. Read the chapter
- Herzberg
- Two-factor theory: hygiene factors (pay, conditions) prevent dissatisfaction but don't motivate; motivators (achievement, recognition, growth) create satisfaction. Read the chapter
- McGregor
- Theory X assumes people dislike work and need control; Theory Y assumes people are self-motivated and want responsibility. Modern PM practice leans Theory Y. Read the chapter
- McClelland
- Acquired-needs theory: people are driven mainly by a need for achievement, affiliation or power. Assign work that fits each person's dominant need. Read the chapter
- Power/interest grid
- Classifies stakeholders by power and interest: manage closely (high/high), keep satisfied (high power, low interest), keep informed (low power, high interest), monitor (low/low). Read the chapter
- Stakeholder register
- The project document listing stakeholders with their role, interest, influence, expectations and classification. Check it first when a stakeholder question comes up. Read the chapter
- Salience model
- Classifies stakeholders by power, urgency and legitimacy. Those with all three are 'definitive' stakeholders who need the most attention. Read the chapter
- Requirements elicitation
- Drawing out what stakeholders actually need through interviews, workshops, observation, prototypes and similar techniques — not just recording what they first ask for. Read the chapter
- Assumption log
- Records assumptions and constraints made during the project, so they can be validated and their impact tracked if they turn out to be wrong. Read the chapter
- RACI
- A responsibility assignment matrix showing who is Responsible, Accountable, Consulted and Informed for each activity. Only one person is Accountable per task. Read the chapter
- Expectation drift
- Stakeholders' expectations gradually moving away from the agreed plan. Prevent it with regular, honest communication and early warning of changes. Read the chapter
- Status reporting
- Regular reports on where the project stands against the plan (scope, schedule, cost, risks). Bad news should be shared early, not hidden until it's certain. Read the chapter
- Trust management
- Deliberately building and keeping stakeholder trust through transparency, consistency and keeping commitments. Lost trust is far harder to rebuild than to keep. Read the chapter
- Tacit vs. explicit knowledge
- Explicit knowledge can be written down (documents, procedures); tacit knowledge lives in people's heads (judgment, experience) and transfers best through mentoring, pairing and shadowing. Read the chapter
- Lessons learned register
- A living record of what worked and what didn't, updated throughout the project — not just at the end — and fed into the organisation's knowledge base at closure. Read the chapter
- Mentoring
- An experienced person guiding a less experienced one over time. One of the best ways to transfer tacit knowledge. Read the chapter
- Communication model
- Sender encodes a message, sends it through a medium, the receiver decodes it and gives feedback; noise can distort it at any point. The sender is responsible for making it clear. Read the chapter
- Push/pull/interactive communication
- Push: sent to recipients (email, memos). Pull: recipients fetch it (intranet, repositories). Interactive: real-time two-way (meetings, calls) — best for urgent or complex issues. Read the chapter
- Communications management plan
- Defines who needs what information, when, in what format, by which method and from whom. The first place to look when someone isn't getting the right updates. Read the chapter
Process
- Integrated PM plan
- The project management plan combining all subsidiary plans and baselines (scope, schedule, cost). Changes to it go through integrated change control. Read the chapter
- Development approach
- How the product will be built: predictive (waterfall), adaptive (agile), incremental, iterative or hybrid. Choose it from the project's uncertainty, risk and constraints. Read the chapter
- Tailoring
- Adapting processes, tools and governance to the project's size, risk and context, rather than applying a methodology rigidly. PMI expects tailoring, not one-size-fits-all. Read the chapter
- WBS
- Work Breakdown Structure: a hierarchical decomposition of the total scope into deliverables and work packages. Together with the scope statement and WBS dictionary it forms the scope baseline. Read the chapter
- Product backlog
- The ordered list of everything that might be needed in the product, owned by the product owner and continuously re-prioritised by value. Read the chapter
- Scope creep
- Uncontrolled growth of scope without matching changes to time, cost or resources. Prevented by routing every change through change control. Read the chapter
- Gold-plating
- The team adding extra, unrequested features. It feels generous but adds risk and cost and bypasses the agreed scope — the PM should stop it. Read the chapter
- MVP
- Minimum Viable Product: the smallest version that delivers value and lets you learn from real users before investing more. Read the chapter
- Value stream
- The end-to-end sequence of activities that delivers value to the customer. Mapping it reveals waste and delays. Read the chapter
- Benefits realization
- Making sure the outcomes the business case promised are actually achieved after delivery — often measured after the project ends. Read the chapter
- RAM/RACI
- A Responsibility Assignment Matrix maps work to people or roles; RACI is the most common form (Responsible, Accountable, Consulted, Informed). Read the chapter
- Resource leveling
- Adjusting start and finish dates to resolve resource over-allocation. It can change the critical path and push out the end date. Read the chapter
- Resource smoothing
- Adjusting activities only within their float so resources are used evenly without changing the critical path or end date. Use it when the deadline can't move. Read the chapter
- Fixed-price
- Contract with a set price for defined scope. The seller carries most of the cost risk; best when scope is clear and stable (FFP, FPIF, FP-EPA). Read the chapter
- Cost-reimbursable
- Contract where the buyer pays the seller's actual costs plus a fee (CPFF, CPIF, CPAF). The buyer carries most of the cost risk; suits uncertain scope. Read the chapter
- Time & materials
- Hybrid contract paying an agreed rate for time and materials used. Good for small or quickly needed work with unclear scope; cap it with a not-to-exceed limit. Read the chapter
- SOW
- Statement of Work: a narrative description of the products, services or results to be supplied under a contract. Read the chapter
- EV
- Earned Value: the budgeted value of the work actually completed (% complete × BAC). Every EVM index puts EV first. Read the chapter
- PV
- Planned Value: the budgeted value of the work scheduled to be done by now. Read the chapter
- AC
- Actual Cost: what has really been spent on the work done so far. Read the chapter
- CPI
- Cost Performance Index = EV ÷ AC. Below 1.0 means over budget; 0.8 means you get 80 cents of work per dollar spent. Read the chapter
- SPI
- Schedule Performance Index = EV ÷ PV. Below 1.0 means behind schedule. Read the chapter
- EAC
- Estimate at Completion: the expected total cost. Most common form: BAC ÷ CPI (current cost performance continues). Read the chapter
- ETC
- Estimate to Complete = EAC − AC: how much more you expect to spend to finish. Read the chapter
- Cost of quality
- Cost of conformance (prevention + appraisal) versus cost of non-conformance (internal + external failures). Spending on prevention is cheapest overall. Read the chapter
- Prevention vs. inspection
- PMI's quality philosophy: build quality in by preventing defects, rather than relying on inspection to catch them afterwards. Read the chapter
- Pareto/fishbone/control charts
- Pareto: ranks causes by frequency (80/20). Fishbone (Ishikawa): finds root causes by category. Control chart: shows whether a process is stable within its control limits (watch the rule of seven). Read the chapter
- Critical path
- The longest path through the schedule network; it sets the shortest possible duration. Activities on it have zero total float. Read the chapter
- Float/slack
- How long an activity can be delayed. Total float: without delaying the project end (LS − ES). Free float: without delaying the next activity. Read the chapter
- Crashing
- Shortening the schedule by adding resources to critical-path activities. It increases cost. Read the chapter
- Fast tracking
- Shortening the schedule by doing activities in parallel that were planned in sequence. Adds risk and rework, but not direct cost. Read the chapter
- Burndown/burnup charts
- Burndown shows work remaining against time; burnup shows work completed and total scope. A burnup makes scope changes visible. Read the chapter
- Status vs. progress reports
- A status report says where the project is now; a progress report says what was accomplished during a period. Forecasts predict where it's heading. Read the chapter
- Variance analysis
- Comparing planned against actual results (scope, schedule, cost) to find the cause and size of a difference and decide on corrective action. Read the chapter
- Acceptance criteria
- The conditions a deliverable must meet before the customer accepts it. Agree them up front; formal acceptance comes before administrative closure. Read the chapter
- Administrative closure
- Closing the project or phase: getting formal acceptance, releasing resources, archiving records, completing final lessons learned and the final report. Read the chapter
- Final lessons learned
- The last update of the lessons learned register at closure, transferred to the organisation's process assets so future projects benefit. Read the chapter
Business Environment
- Governance structure
- The framework of roles, committees and processes that oversees the project and makes key decisions. Tailor it to the project's size and risk. Read the chapter
- Decision rights
- Who has the authority to make which decisions (budget, scope, priority). Clear decision rights stop delays and confusion. Read the chapter
- Escalation path
- The agreed route for raising issues the team can't resolve, and to whom. Use it after trying to resolve at the team level. Read the chapter
- Regulatory compliance
- Meeting the laws, regulations and standards that apply to the project or product. Non-negotiable — compliance gaps must be reported and fixed. Read the chapter
- Audit
- An independent, structured review that checks whether project activities follow organisational and regulatory policies, processes and procedures. Read the chapter
- Compliance categories
- Grouping requirements by type (legal, safety, data privacy, financial, industry standards) so each can be tracked, tested and owned. Read the chapter
- Change control board (CCB)
- The group that reviews and approves or rejects change requests. Even a senior stakeholder's change goes through it. Read the chapter
- Change request
- A formal proposal to change scope, schedule, cost, a baseline or a document. Assess its impact first, then submit it for approval. Read the chapter
- Integrated change control
- The process of reviewing all change requests and assessing their impact across scope, schedule, cost, quality and risk before approving or rejecting them. Read the chapter
- Impediment
- Anything slowing the team down. Removing impediments is a core part of servant leadership. Read the chapter
- Blocker
- An impediment that stops work completely until it's resolved. Try to resolve it within the team first, then use authority or escalate. Read the chapter
- Escalation threshold
- The pre-agreed point (time, cost, impact) at which an issue must be escalated to a higher level. Read the chapter
- Risk register
- The document listing identified risks with their probability, impact, owner, triggers and planned responses. Update it throughout the project. Read the chapter
- Probability/impact matrix
- A grid that rates each risk by its likelihood and impact, so you can prioritise which risks to respond to first. Read the chapter
- Risk response strategies
- Threats: escalate, avoid, transfer, mitigate, accept. Opportunities: escalate, exploit, share, enhance, accept. Read the chapter
- Retrospective
- A regular team meeting to inspect how the team works and agree concrete improvements. Without an assigned action item, it's just complaining. Read the chapter
- Kaizen
- Japanese for 'change for the better': continuous, small, incremental improvements made by everyone, all the time. Read the chapter
- Process improvement plan
- Describes how project processes will be analysed to find and implement improvements that add value. Read the chapter
- Change management (organizational)
- Helping people adopt a change through communication, training, support and reinforcement. Without it, a technically successful project can still fail on adoption. Read the chapter
- ADKAR
- Prosci's change model: Awareness, Desire, Knowledge, Ability, Reinforcement — the stages a person moves through to accept a change. Read the chapter
- Resistance to change
- People's natural reluctance to change. Address it by listening, involving them early, explaining the 'why' and supporting them through the transition. Read the chapter
- PESTLE
- Analysis of the external environment: Political, Economic, Social, Technological, Legal and Environmental factors that could affect the project. Read the chapter
- Business case revalidation
- Re-checking that the project is still worth doing when the environment changes. If a regulation or market shift undermines it, raise it with the sponsor. Read the chapter
- Environmental scanning
- Continuously watching the external environment (market, regulations, technology, competitors) for changes that could affect the project's value. Read the chapter
PMI-ACP key terms
Mindset
- Osmotic communication
- Alistair Cockburn's term for information team members absorb just by overhearing nearby conversations. A key benefit of co-location. Read the chapter
- Caves and commons
- A co-located layout: an open 'commons' for collaboration and spontaneous conversation, plus quiet 'caves' for focused, heads-down work. Read the chapter
- Information radiator
- A highly visible display of project information (task board, burndown chart, build status) that anyone passing by can read at a glance. Read the chapter
- Pair programming
- Two developers at one workstation: one writes code (the driver) while the other reviews in real time (the navigator), swapping often. Improves quality and spreads knowledge. Read the chapter
- Distributed team tooling
- Tools that recreate co-location for remote teams: always-on video links, shared digital boards, chat and virtual whiteboards. Read the chapter
- Active listening
- Listening to fully understand the speaker, at three levels: internal, focused and global. Read the chapter
- Internal listening
- Level 1: listening through your own thoughts and reactions — useful for self-awareness, but you miss what the speaker means. Read the chapter
- Focused listening
- Level 2: full attention on the speaker's words, meaning and emotion. Read the chapter
- Global listening
- Level 3: taking in everything — words, tone, body language and the room's dynamics. What skilled facilitators use. Read the chapter
- Nominal group technique
- Each person writes ideas silently first, then the group shares, discusses and ranks them. Stops louder voices drowning out quieter ones. Read the chapter
- Group passing technique
- An idea sheet is passed round the group; each person adds to what the last person wrote. Read the chapter
- Directed brainstorming
- Brainstorming restricted to a specific, pre-chosen topic or root cause. Read the chapter
- Guided brainstorming
- A facilitator steers the group toward an objective, without narrowing the topic as tightly as directed brainstorming. Read the chapter
- Two-way communication
- Communication that flows both ways in real time (conversations, team chat), so understanding can be checked and corrected straight away. Read the chapter
- Tuckman's model
- Team development stages: forming, storming, norming, performing, adjourning. Each stage calls for a different leadership style. Read the chapter
- Forming
- The team has just come together: polite, roles unclear, little visible conflict. Leader style: directing. Read the chapter
- Storming
- Real conflict surfaces as roles and ways of working are contested. Leader style: coaching. Read the chapter
- Norming
- Roles settle, trust builds and the team agrees how to work. Leader style: supporting. Read the chapter
- Performing
- A mature, self-organising team that resolves its own issues and delivers. Leader style: delegating. Read the chapter
- Adjourning
- The work ends and the team disbands. Recognise contributions and capture lessons learned. Read the chapter
- Shu-Ha-Ri
- Stages of mastering a practice, from martial arts. Shu: follow the rules exactly. Ha: start adapting them. Ri: transcend them — you embody the principle. Read the chapter
- Dreyfus model
- Five stages of skill acquisition: novice, advanced beginner, competent, proficient, expert. Read the chapter
- Novice
- Dreyfus stage 1: needs explicit, step-by-step rules; no situational judgment yet. Read the chapter
- Advanced beginner
- Dreyfus stage 2: starts to recognise recurring patterns but is still rule-bound. Read the chapter
- Competent
- Dreyfus stage 3: can plan and prioritise, and takes responsibility for outcomes. Read the chapter
- Proficient
- Dreyfus stage 4: sees the whole situation and knows what matters, guided by experience. Read the chapter
- Expert
- Dreyfus stage 5: acts intuitively from deep experience, without needing rules. Read the chapter
- Sprint retrospective
- The event at the end of each sprint where the team reflects on how it worked and agrees improvements for the next sprint. Read the chapter
- Set the Stage
- Retrospective step 1 (Derby & Larsen): create safety and frame the session. Read the chapter
- Gather the Data
- Retrospective step 2: build a shared, factual picture of what actually happened. Read the chapter
- Generate Insights
- Retrospective step 3: ask why things happened and look for patterns and root causes. Read the chapter
- Decide What to Do
- Retrospective step 4: agree a few specific, owned improvement actions. Read the chapter
- Close the Retrospective
- Retrospective step 5: summarise, thank people and reflect on how the retrospective itself could improve. Read the chapter
- Intraspective
- An ad-hoc retrospective called mid-sprint when something goes wrong, instead of waiting for the scheduled one. Read the chapter
- Lessons learned
- Knowledge gained during the work. Retrospectives capture lessons every iteration so the very next iteration improves. Read the chapter
- Process tailoring
- Adapting the team's process to the project's real needs instead of following a fixed process regardless of fit. Read the chapter
- Blended Agile
- Combining practices from two or more agile methods (e.g. ScrumBan) so the project uses exactly what it needs. Read the chapter
- ScrumBan
- Scrum's sprint structure with Kanban's board and WIP limits. Read the chapter
- Disciplined Agile Delivery (DAD)
- A toolkit that draws practices from Scrum, Lean, agile modelling and others, letting teams choose their way of working. Read the chapter
- Hybrid model
- Blending agile with traditional (waterfall) practices, e.g. predictive planning with agile delivery. Read the chapter
- AgileFall
- A hybrid where agile and waterfall practices are combined, often waterfall planning and governance around agile development. Read the chapter
- WaterSprint
- A hybrid that runs waterfall-style phases inside short sprints — often a sign of only partial agile adoption. Read the chapter
- Project pre-mortem
- The team imagines the project has already failed and works backwards to identify what caused it, then plans to prevent those causes. Read the chapter
- Extreme Programming (XP)
- An agile method focused on engineering practices: TDD, pair programming, continuous integration, refactoring and small releases. Read the chapter
- Kent Beck
- The creator of Extreme Programming (XP) and author of 'Test-Driven Development by Example'. Read the chapter
- C3 Payroll project
- Chrysler's Comprehensive Compensation payroll project, where Kent Beck developed and first applied XP in the late 1990s. Read the chapter
- Engineering best practices
- Technical practices that keep code quality high — XP's focus: TDD, refactoring, pair programming, continuous integration, coding standards. Read the chapter
- Whole Team
- XP practice: the team works as one unit and whoever is best suited picks up each task — no fixed, prescribed roles. Read the chapter
- XP Values
- Communication, simplicity, feedback, courage and respect. Read the chapter
- XP Roles
- Programmer, tester, coach, customer and an optional tracker. Read the chapter
- XP Activities
- Four core activities: listening, designing, coding and testing. Read the chapter
- Collective code ownership
- Anyone on the team can change any part of the code, so knowledge spreads and nobody becomes a bottleneck. Read the chapter
- Crystal methods
- Alistair Cockburn's family of agile methods, tuned to team size and project criticality — more people and higher stakes mean more process. Read the chapter
- Alistair Cockburn
- Agile Manifesto signatory who created the Crystal methods and coined 'osmotic communication' and 'caves and commons'. Read the chapter
- Criticality
- In Crystal, what's at stake if the system fails: comfort, discretionary money, essential money, or life. Higher criticality needs more rigour. Read the chapter
- Crystal Clear
- The lightest Crystal method, for small co-located teams (up to about 6–8 people) on low-criticality projects. Read the chapter
- Crystal Yellow/Orange/Red/Maroon
- Heavier Crystal methods for progressively larger teams and higher criticality: more documentation, verification and coordination. Read the chapter
- Agile suitability tools
- Assessments (e.g. of culture, team and project factors) that help decide whether an agile, predictive or hybrid approach fits a project. Read the chapter
Leadership
- Voice of Customer (VOC)
- The end user's or customer's perspective: what they need, what 'done' means to them, what they'd pay for. Read the chapter
- Voice of Business (VOB)
- The sponsor's or business's perspective: return on investment, budget, strategic fit and market timing. Read the chapter
- Reciprocal commitment
- Both sides make offsetting promises — e.g. the team commits to delivering, the business commits to not changing the sprint — rather than one side just demanding. Read the chapter
- Pigs and Chickens
- A fable about commitment: 'pigs' (the delivery team) are committed and speak at the daily stand-up; 'chickens' (stakeholders) are involved but don't drive it. Read the chapter
- Emotional intelligence
- The ability to recognise and manage your own emotions and to understand and influence others'. Goleman's five components: self-awareness, self-regulation, motivation, empathy and social skill. Read the chapter
- Self-awareness
- Recognising your own emotions, strengths and triggers as they happen. Read the chapter
- Self-regulation
- Managing your reactions and impulses instead of being driven by them. Read the chapter
- Empathy
- Understanding other people's feelings and viewpoints. On the exam: check in privately with a struggling team member before treating it as a performance issue. Read the chapter
- Social skill
- Managing relationships, building networks and influencing others — the outward-facing part of emotional intelligence. Read the chapter
- Collaboration
- Working together continuously throughout the work, rather than handing finished pieces between specialists in sequence. Read the chapter
- Agile Manifesto
- Four values: individuals and interactions over processes and tools; working software over comprehensive documentation; customer collaboration over contract negotiation; responding to change over following a plan. Plus 12 principles. Read the chapter
- Adaptive leadership
- Leading through uncertainty by helping the team learn, experiment and adapt, rather than handing down fixed answers. Read the chapter
- Situational leadership
- Adapting your leadership style to the team's maturity and the task: directing → coaching → supporting → delegating as competence and commitment grow (Hersey-Blanchard). Read the chapter
- Hersey-Blanchard
- The authors of situational leadership: four styles — directing, coaching, supporting, delegating — matched to the team's competence and commitment. Read the chapter
- Servant leadership
- A leadership style that puts the team first: removing obstacles, shielding the team, coaching and supporting rather than commanding. The default leadership style on the exam for agile and high-trust teams. Read the chapter
- Directing
- Situational leadership style for a new team: clear, specific instructions and close supervision (Tuckman: forming). Read the chapter
- Coaching
- Situational leadership style for a team gaining skills: explain decisions, ask for input, still give direction (Tuckman: storming). Read the chapter
- Supporting
- Situational leadership style for a capable team: share decisions and encourage; less direction (Tuckman: norming). Read the chapter
- Delegating
- Situational leadership style for a mature, self-managing team: hand over decisions and step back (Tuckman: performing). Read the chapter
- Negotiation
- Reaching agreement between parties with different interests. In agile, aim for win–win outcomes that keep the relationship intact. Read the chapter
- Contest
- A bounded disagreement over a specific issue, where both sides still want to win fairly and can accept the result. Usually just needs facilitation. Read the chapter
- Crusade
- A conflict escalated into attacks on people's character or motives. Needs active de-escalation before any resolution technique will work. Read the chapter
- Force/Direct
- Imposing one view through authority (win–lose). Reserve it for emergencies, safety or truly non-negotiable issues — it damages trust. Read the chapter
- Smooth/Accommodate
- Emphasising agreement and conceding on minor points to keep harmony. Protects the relationship but leaves the real issue unresolved. Read the chapter
- Compromise/Reconcile
- Both sides give something up. Fast, but often leaves nobody fully satisfied. Read the chapter
- Withdraw/Avoid
- Retreating from or postponing a conflict. Only appropriate when emotions need to cool or the issue is trivial — it doesn't resolve anything. Read the chapter
- Collaborate/Problem-solve
- Working through the disagreement openly to reach a solution that includes both viewpoints (win–win). The preferred approach on the exam when there's time. Read the chapter
- Kaizen
- Japanese for 'change for the better': small, continuous improvements, made through repeated Plan-Do-Check-Act cycles. Read the chapter
- Plan-Do-Check-Act (PDCA)
- Deming's improvement cycle. Plan a change, do it on a small scale, check the results against the plan, act on what you learned. Read the chapter
- Deming cycle
- Another name for Plan-Do-Check-Act (PDCA), the cycle through which Kaizen improvements are made. Read the chapter
- Fishbone (Ishikawa) diagram
- A cause-and-effect diagram whose 'bones' group possible causes by category, leading to the problem at the 'head'. Used for root cause analysis. Read the chapter
- 5-Why analysis
- Ask 'why?' repeatedly (about five times) until you reach the underlying cause instead of stopping at a symptom. Read the chapter
- Root cause analysis
- Finding the underlying cause of a problem so it can be fixed for good, rather than treating symptoms. Tools: fishbone, 5 Whys. Read the chapter
- Build Integrity In
- Lean principle: build quality in from the start, both perceived integrity (customer experience) and conceptual integrity (sound architecture). Read the chapter
- Perceived Integrity
- How the customer experiences the system. They judge quality entirely by what they see and use. Read the chapter
- Conceptual Integrity
- The system's internal coherence: its components work well together as a whole. Read the chapter
- Last Responsible Moment
- Lean principle (decide as late as possible): make a decision when you have the most information, but before delaying it causes harm. Read the chapter
- Empower the Team
- Lean principle: trust the people doing the work to make decisions and improve their own process. Read the chapter
- Optimize the Whole
- Lean principle: improve the entire value stream, not just one part of it, and avoid local optimisation. Read the chapter
- Peter Senge
- Author of 'The Fifth Discipline' on systems thinking — the idea behind Lean's 'optimise the whole'. Read the chapter
- The Fifth Discipline
- Peter Senge's book on systems thinking: seeing whole systems and their interrelationships rather than isolated parts. Read the chapter
Product
- Value stream mapping (VSM)
- A visual map of a process from request to delivery, showing value-added time against waiting (waste) time. Read the chapter
- Cumulative flow diagram (CFD)
- A chart of work items in each state over time. Widening bands show bottlenecks; the horizontal gap between bands shows cycle or lead time. Read the chapter
- Work in progress (WIP)
- Work that has started but isn't finished. Too much WIP slows everything down — Little's Law: cycle time = WIP ÷ throughput. Read the chapter
- Cycle time
- The time an item takes from when work starts on it to when it's delivered, including both work and waiting time. Read the chapter
- Lead time
- The time from when a request is made (enters the backlog) to when it's delivered. Lead time includes cycle time. Read the chapter
- Throughput
- How much work is completed per period (e.g. stories per week). In value stream mapping, process efficiency = work time ÷ total time. Read the chapter
- Quality
- How well the product meets customer needs: both intrinsic (how well it's built) and extrinsic (how much value it delivers). Read the chapter
- Conformance to requirements
- A definition of quality: the product meets its stated, documented requirements. Read the chapter
- Fitness for use
- A definition of quality: the product actually works for its intended purpose in real use. Read the chapter
- Performance
- Quality attribute: does the product do what it's supposed to do, and how well? Read the chapter
- Reliability
- Quality attribute: does the product keep working consistently over time? Read the chapter
- Serviceability
- Quality attribute: how quickly and easily the product can be repaired or supported. Read the chapter
- Perceived quality
- Quality attribute: the customer's impression of quality, shaped by brand, reputation and experience. Read the chapter
- Iron triangle
- The traditional triple constraint: scope fixed at the top, with cost and schedule estimated from it. A change to one forces a change in the others. Read the chapter
- Inverted triangle
- Agile flips the iron triangle: cost (team) and time (iterations) are fixed, and scope is the variable. Read the chapter
- Agile Triangle of Constraints
- Jim Highsmith's model: value (extrinsic quality) at the top as the goal, with quality (intrinsic) and constraints (scope, cost, schedule) at the base. Read the chapter
- Intrinsic quality
- How well the product is built internally: architecture, code quality, low technical debt. Read the chapter
- Extrinsic quality
- The value the product delivers to the customer: features that solve real problems. Read the chapter
- Organic quality
- Quality that comes naturally from following agile practices: iterations, reviews, pair programming, continuous integration. Read the chapter
- Overt quality
- Quality from deliberate, explicit measures: verification, validation, unit, integration and regression tests. Read the chapter
- Today vs. tomorrow quality
- Today's quality: correct functionality delivering value now. Tomorrow's quality: the product's ability to keep delivering value and adapt to change, by keeping technical debt low. Read the chapter
- Product Backlog
- The ordered list of everything needed in the product, owned by the product owner. Its commitment is the Product Goal. Read the chapter
- Sprint Backlog
- The sprint goal, the backlog items selected for the sprint and the plan to deliver them, owned by the developers. Its commitment is the Sprint Goal. Read the chapter
- Product Increment
- The sum of all completed work that meets the Definition of Done — a usable step toward the Product Goal. Read the chapter
- Product Goal
- The long-term objective for the product; the commitment for the Product Backlog. Read the chapter
- Sprint Goal
- The single objective for the sprint; the commitment for the Sprint Backlog. Read the chapter
- Definition of Done
- The shared checklist a work item must meet to count as complete. In Scrum, the Product Increment's commitment. Read the chapter
- Backlog refinement
- Ongoing work to break down, clarify, estimate and order Product Backlog items so they're ready for upcoming sprints. Read the chapter
- Scrum of Scrums
- A meeting of representatives from several Scrum teams working on the same product, to coordinate dependencies and cross-team impediments. Read the chapter
Delivery
- Incremental development and delivery
- Building and delivering the product in small, working pieces, with short iterations, frequent verification and validation, and continuous integration. Read the chapter
- Frequent verification
- Regularly checking the product is built right — meets its specifications (e.g. tests, reviews). Read the chapter
- Frequent validation
- Regularly checking the right product is being built — it meets the customer's real needs (e.g. demos, reviews). Read the chapter
- Hardening iteration
- A final iteration before release focused on verification, validation and stabilisation. A safety net, not a substitute for testing throughout. Read the chapter
- Continuous integration (CI)
- Developers merge small changes into a shared repository frequently, each verified by an automatic build and tests, so conflicts and defects surface early. Read the chapter
- Definition of Done
- The shared checklist a work item must meet to count as complete. In Scrum, the Product Increment's commitment. Read the chapter
- Technical debt
- The future cost of shortcuts and poor design in the code. Left unpaid, it slows the team down and can lead to 'design death'. Read the chapter
- Design death
- The point where technical debt has grown so large that the code can no longer be changed safely or economically. Read the chapter
- Refactoring
- Improving the internal structure of code without changing its behaviour, to keep it clean and reduce technical debt. Read the chapter
- Pair programming
- Two developers at one workstation: one writes code (the driver) while the other reviews in real time (the navigator), swapping often. Improves quality and spreads knowledge. Read the chapter
- Test-Driven Development (TDD)
- Write a failing test first, write just enough code to pass it, then refactor (red–green–refactor). Also called test-first development. Read the chapter
- Acceptance Test-Driven Development (ATDD)
- The whole team agrees acceptance tests for a story before building it — 'begin with the end in mind'. Read the chapter
- Exploratory testing
- Unscripted testing where the tester learns the system and designs tests on the fly to find unexpected defects. Read the chapter
- Usability testing
- Watching real users perform real tasks to find where the product is hard or confusing to use. Read the chapter
- Scope creep
- Uncontrolled expansion of scope without adjusting time, cost or resources. Read the chapter
- Gold plating
- Delivering extra, unrequested functionality. It adds untested scope and cost the customer never asked for — a form of waste. Read the chapter
- Planning Game
- XP's planning meeting each iteration, covering release and iteration planning, in three phases: exploration, commitment and steering. Read the chapter
- Small Releases
- XP practice: frequent, small, valuable releases instead of one big release, giving early feedback and catching defects while they're cheap. Read the chapter
- Customer Tests
- XP practice: the customer defines and runs acceptance tests to confirm the system does what they expect. Read the chapter
- Simple Design
- XP practice: build the simplest design that works for today's needs — no speculative features (YAGNI). Read the chapter
- Collective Code Ownership
- XP practice: the whole team owns all the code, and anyone may improve any part of it. Read the chapter
- Sustainable Pace
- XP practice (originally the 40-hour week): work at a pace the team can keep up indefinitely, avoiding burnout. Read the chapter
- Metaphor
- XP practice: a shared story or analogy describing how the system works, giving everyone a common vocabulary. Read the chapter
- Slack
- XP practice: deliberately include a few small, low-priority items in each iteration that can be dropped if the team falls behind. Read the chapter
- Lean Software Development
- Lean manufacturing principles applied to software (Mary and Tom Poppendieck): eliminate waste, build quality in, deliver fast, defer decisions, empower the team, optimise the whole. Read the chapter
- Just In Time (JIT)
- Toyota's concept of producing only what is needed, when it's needed — the root of Lean. Read the chapter
- Mary and Tom Poppendieck
- Authors of 'Lean Software Development: An Agile Toolkit', who adapted Lean's principles and seven wastes to software. Read the chapter
- Muda
- Japanese for waste: anything that adds no value for the customer. Read the chapter
- Muri
- Japanese for overburden: pushing people or systems beyond their capacity. (Mura, its partner, means unevenness.) Read the chapter
- Partially Done Work
- Lean waste: work started but not finished (unmerged code, untested features). Also called work in progress. Read the chapter
- Task Switching
- Lean waste: juggling several items or teams at once instead of finishing one before starting the next. Read the chapter
- Set-Based Development
- Keep several design options open as long as possible and eliminate weaker ones over time, rather than choosing one up front. Read the chapter
- Options Thinking
- Paying a small cost to keep a choice open without fully committing, so you can decide later with better information. Read the chapter
- Pull Systems
- Work is pulled forward when there is capacity for it, rather than pushed onto the team regardless. Read the chapter
- Queuing Theory
- The mathematics of waiting lines. Too much work in the queue increases waiting time and cycle time — limit WIP. Read the chapter
- Cycle Time
- The time from starting work on an item (or selecting a story) to delivering it, including wait and work time. Read the chapter
- Throughput
- How much work is completed per period (e.g. stories per week). In value stream mapping, process efficiency = work time ÷ total time. Read the chapter
- Cost of Delay
- The value lost by not delivering a feature when the customer or market needed it. Used to prioritise work. Read the chapter
- Last Responsible Moment
- Lean principle (decide as late as possible): make a decision when you have the most information, but before delaying it causes harm. Read the chapter
- Kanban
- A visual workflow management method: visualise the work, limit WIP, manage flow, and pull work as capacity allows. Read the chapter
- Visual workflow management
- Making every work item and its status visible (e.g. on a board) so bottlenecks and blockers stand out. Read the chapter
- Work In Progress (WIP) limit
- A cap on how many items can be in a workflow state at once. When a column is full, the team helps clear it before starting new work. Read the chapter
- Management by Sight
- Kanban goal: anyone can see the state of the work and where problems are just by looking at the board. Read the chapter
- Bottleneck
- A step in the workflow where work piles up because capacity is lower than demand. It limits the whole system's throughput. Read the chapter
- Value Chain
- The full sequence of steps that delivers value to the customer. Kanban aims to control the whole chain, not one stage. Read the chapter
PMI-RMP key terms
Risk Strategy and Planning
- Preliminary document analysis
- Reviewing existing documents — historical data, lessons learned, industry benchmarks — before formal risk identification begins. Domain I, Task 1. Read the chapter
- Industry benchmarks
- Published data on how similar projects or organizations in the same industry typically perform, used to sanity-check assumptions during preliminary analysis. Read the chapter
- Historical information
- Records from past, similar projects (schedules, costs, risks that occurred) used to inform current risk planning and avoid repeating known mistakes. Read the chapter
- Lessons learned register
- A document capturing what worked and what didn't on past projects — a key preliminary-analysis input, and something every closed risk should feed back into. Read the chapter
- OPA
- Organizational Process Assets — templates, historical data, and processes an organization already has, which shape which risk methodology fits a given project. Read the chapter
- EEF
- Enterprise Environmental Factors — conditions outside the project's control (culture, market, regulations) that shape which development approach and risk process fit. Read the chapter
- PESTLE
- Political, Economic, Social, Technological, Legal, Environmental — a framework for scanning the external environment for threats and opportunities. Read the chapter
- SWOT analysis
- Strengths, Weaknesses, Opportunities, Threats — used alongside PESTLE to assess a project's environment during risk strategy and planning. Read the chapter
- Risk appetite
- An organization's general attitude toward accepting uncertainty — how much risk it's willing to take on, in principle, to pursue its objectives. Read the chapter
- Risk culture maturity
- An assessment of how an organization's actual, lived risk behavior compares to its stated risk appetite — stated and lived appetite can genuinely differ. Read the chapter
- Risk threshold
- The specific, calculated boundary a risk appetite translates into for a given project — the line past which exposure becomes unacceptable. Read the chapter
- Risk tolerance
- The degree of variation from a target that a stakeholder is willing to accept on a specific objective — a more granular cousin of risk threshold. Read the chapter
- Risk capacity
- The objective maximum amount of risk an organization could absorb, as distinct from risk appetite (how much it chooses to take on, often less than its full capacity). Read the chapter
- Risk management strategy
- The high-level approach — processes, tools, metrics, and risk categories — an organization or project will use to manage risk, set early in Domain I. Read the chapter
- Risk categories
- Groupings risks fall into (e.g. technical, external, organizational, project management), established in the risk management strategy to enable meaningful analysis. Read the chapter
- Risk metrics
- Measures used to track risk exposure and response effectiveness over time, defined as part of establishing the risk management strategy. Read the chapter
- Servant leadership
- A leadership style — coaching and enabling the team's own risk competence rather than mandating a rigid process top-down. Named explicitly in Domain I. Read the chapter
- Risk management plan
- The documented plan covering roles, the RBS, communication cadence, and prioritization criteria for how risk will be managed across the project. Read the chapter
- Risk Breakdown Structure (RBS)
- A hierarchical decomposition of risk categories, similar to how a WBS decomposes scope — distinct from the risk register, which logs specific risk instances. Read the chapter
- RACI
- A Responsibility Assignment Matrix (Responsible, Accountable, Consulted, Informed) used to align risk roles so register updates don't fall through the cracks. Read the chapter
- Risk communication plan
- Part of the risk management plan defining how risk information will be shared with stakeholders — tailored per audience, not one generic update. Read the chapter
- Risk prioritization criteria
- The agreed rules for ranking competing risks against each other, documented in the risk management plan ahead of actual analysis. Read the chapter
- Stakeholder risk attitude
- A stakeholder's individual disposition toward risk — their personal comfort with uncertainty, which can differ from the organization's overall appetite. Read the chapter
- Rules of engagement
- Clear expectations set with stakeholders about how their input will actually be used in the risk process, so engagement is genuine rather than symbolic. Read the chapter
- Risk prioritization
- The act of ranking identified risks against each other using agreed criteria, so the team knows where to focus limited response effort. Read the chapter
- Stakeholder empowerment
- Actively enabling stakeholders to challenge existing risk thresholds and assumptions, rather than treating early decisions as fixed and final. Read the chapter
Risk Identification
- Risk identification exercises
- Structured activities — meetings, interviews, focus groups, SME support — used to surface candidate risks before they're screened into the register. Read the chapter
- SME interviews
- Structured conversations with subject matter experts used during risk identification exercises to surface risks the team itself might miss. Read the chapter
- Threats vs. opportunities
- The two-sided nature of risk in PMI-RMP: every identified risk is indicated as either a threat (negative) or an opportunity (positive) from the start. Read the chapter
- Assumption log
- A record of things taken as true without proof; each entry is a candidate source of risk, since an assumption can turn out to be wrong or shift unexpectedly. Read the chapter
- Constraint analysis
- Examining fixed limits the project must operate within, since constraints — like assumptions — can shift or prove inaccurate and introduce risk. Read the chapter
- Cascade effect
- How a small, easy-to-overlook assumption can ripple into a larger impact on project objectives (like schedule) once the chain is traced far enough. Read the chapter
- Risk trigger
- The event or condition that signals a risk is about to happen or has just started happening — distinct from its cause and its consequence. Read the chapter
- Risk cause
- The underlying reason a risk could occur in the first place — distinct from its trigger (the signal) and its consequence (the resulting impact). Read the chapter
- Risk consequence
- What happens to the project if a risk actually occurs — the resulting impact, distinct from the risk's cause and its trigger. Read the chapter
- Risk threshold (contextual)
- A threshold reassessed and confirmed against updated risk data as a project's actual context evolves — thresholds aren't fixed forever once documented. Read the chapter
- Risk register
- The central artifact logging every validated risk and its attributes (probability, impact, urgency, origin) — built only from risks that passed a validity screen. Read the chapter
- Risk attributes
- The core fields scored for each risk in the register: probability (likelihood), impact (severity), and urgency (how soon the window for action closes). Read the chapter
- Risk ownership
- The named person accountable for monitoring and executing the response to a specific risk — without an owner, a response plan risks never being activated. Read the chapter
- Internal vs. external risk
- A risk's classified origin: internal (within the project team's control) or external (outside it, such as a regulatory or market shift). Read the chapter
Risk Analysis
- Qualitative risk analysis
- Prioritizing risks using a consistent probability-and-impact assessment against agreed definitions — produces a relative, ordinal ranking, not a dollar figure. Read the chapter
- Risk matrix
- The standard tool for qualitative analysis: an agreed assessment approach, historical information, probability/impact definitions, categories, and pre-set criteria. Read the chapter
- Nominal vs. ordinal classification
- Two scoring approaches in qualitative analysis: nominal groups risks into categories (e.g. high/medium/low); ordinal ranks them relative to one another. Read the chapter
- Probability and impact
- The two core dimensions scored in qualitative analysis — likelihood of occurrence, and severity of consequence if it occurs. Read the chapter
- Quantitative risk analysis
- Numerically modeling risk — EMV, simulations, sensitivity analysis — typically reserved for the highest-priority risks a qualitative pass already surfaced. Read the chapter
- Monte Carlo simulation
- A quantitative technique that runs many randomized scenarios to produce a probability distribution of possible project outcomes (cost, schedule, etc.). Read the chapter
- Decision tree
- A quantitative tool that maps out sequential decisions and their probability-weighted outcomes, helping compare competing response options. Read the chapter
- Expected Monetary Value (EMV)
- Probability × impact, summed across all possible outcomes — gives one comparable numeric figure per risk or response option. Read the chapter
- Sensitivity analysis
- A quantitative technique (e.g. Monte Carlo, decision trees) that shows how sensitive a project's outcome is to changes in a given risk variable. Read the chapter
- SWOT analysis
- Strengths, Weaknesses, Opportunities, Threats — used alongside PESTLE to assess a project's environment during risk strategy and planning. Read the chapter
- Ishikawa (fishbone) diagram
- A root-cause tool that traces a risk back to its underlying causes across categories — people, process, environment, and more. Read the chapter
- Tree diagram
- A branching diagram used to assess risk complexity by visually tracing how root causes lead to specific risk outcomes. Read the chapter
- Impact analysis
- Evaluating a risk's effect across every relevant project objective — cost, schedule, quality, AND compliance/governance — not just the obvious one or two. Read the chapter
Risk Response
- Avoid
- A threat-response strategy: eliminating the risk entirely by removing its source, such as cutting the feature or activity that created it. Read the chapter
- Mitigate
- A threat-response strategy: reducing a negative risk's probability or impact without necessarily eliminating it — the most common threat response. Read the chapter
- Transfer
- A threat-response strategy: shifting the financial or operational consequence of a risk to a third party, such as through insurance or a contract clause. Read the chapter
- Accept
- A response strategy (threat or opportunity) acknowledging the risk with no further proactive action — can be passive (monitor only) or active (set aside a contingency reserve). Read the chapter
- Exploit
- An opportunity-response strategy: taking deliberate action to ensure a positive risk definitely occurs, rather than leaving it to chance. Read the chapter
- Enhance
- An opportunity-response strategy: actively increasing the probability or impact of a positive risk being realized — the mirror of mitigate. Read the chapter
- Share
- An opportunity-response strategy: partnering with a third party who is better positioned to capture an opportunity, splitting the resulting gain. Read the chapter
- Risk burndown chart
- A tool (alongside dot plots) that illustrates and communicates how risk exposure decreases over time as responses are implemented. Read the chapter
- Workaround
- An unplanned response to a risk that wasn't identified in advance — reactive, as opposed to a pre-planned response strategy. Read the chapter
- Secondary risk
- A new risk introduced BY implementing a response to a different, original risk — logged as its own register entry with its own response plan. Read the chapter
- Residual risk
- The risk that remains after a response has been implemented — most responses (especially mitigate) reduce exposure without eliminating it completely. Read the chapter
- Contingency plan execution
- Carrying out a pre-planned response — drawing on a contingency reserve of time or budget — once a risk's defined trigger condition is met. Read the chapter
Monitor and Close Risks
- Variance analysis
- Comparing actual risk-relevant performance data against the baseline to see whether real exposure is tracking as expected during monitoring. Read the chapter
- Risk exposure
- The overall level of risk a project currently carries, often tracked in aggregate and reported to stakeholders on a regular cadence. Read the chapter
- Work package reconciliation
- Reconciling performance data and reports specifically from risk-relevant work packages, comparing actual status against the baseline. Read the chapter
- Residual risk monitoring
- Checking back on a risk's remaining exposure after a response was implemented — treating implementation as a checkpoint, not a permanent finish line. Read the chapter
- Secondary risk monitoring
- Actively watching for new risks introduced by implemented responses, so they get logged and managed rather than missed entirely. Read the chapter
- Risk register updates
- Keeping the register current as risk status changes — including documented closure of expired risks rather than letting them accumulate unreviewed. Read the chapter
- Expired risk
- A risk tied to a project phase or condition that no longer applies — should be closed with documented rationale, not silently deleted or left active. Read the chapter
- Change log
- A project document updated with aggregated risk data as part of Domain V's responsibility to keep related documents current, not just the register itself. Read the chapter
- Overall project risk level
- The aggregate, whole-project risk exposure — distinct from any single risk's status — often the subject of recurring steering-committee reporting. Read the chapter
- Risk reporting
- Communicating risk information on a regular, planned cadence (set in Domain I) so stakeholders can track a consistent trend, not just hear about problems. Read the chapter
- Stakeholder-tailored reporting
- Preparing different levels of risk detail for different audiences — a summarized view for executives, a more granular one for the delivery team. Read the chapter
Scrum Master key terms
Scrum Theory and Values
- Empiricism
- Knowledge comes from experience, and decisions are made on what is actually observed. Scrum is founded on empiricism and lean thinking. Read the chapter
- Transparency
- The process and the work are visible to those doing it and those receiving it, so decisions are based on the real state of the artifacts. Read the chapter
- Inspection
- Frequently and diligently checking the artifacts and progress toward agreed goals to spot problems early. Every Scrum event is an inspection opportunity. Read the chapter
- Adaptation
- Adjusting the process or product as soon as possible when something drifts outside acceptable limits. Harder when people aren't empowered or self-managing. Read the chapter
- Lean thinking
- Reducing waste and focusing on the essentials. With empiricism, one of Scrum's two foundations. Read the chapter
- Iterative delivery
- Revisiting and improving the product and the way of working cycle after cycle (Sprint after Sprint). Read the chapter
- Incremental delivery
- Delivering value in usable pieces, each Increment adding to the previous ones, to optimize predictability and control risk. Read the chapter
- Scrum framework
- A lightweight framework for complex problems. It defines only accountabilities, events, artifacts and rules, and is intentionally incomplete. Read the chapter
- Commitment
- A Scrum value: the team commits to achieving its goals and to supporting each other — not to delivering every forecast item no matter what. Read the chapter
- Focus
- A Scrum value: the primary attention is on the work of the Sprint, to make the best possible progress toward the goals. Read the chapter
- Openness
- A Scrum value: the team and stakeholders are open about the work and the challenges. It makes transparency possible. Read the chapter
- Respect
- A Scrum value: team members respect each other as capable, independent people, and are respected as such. Read the chapter
- Courage
- A Scrum value: having the courage to do the right thing and to work on tough problems — including raising bad news. Read the chapter
The Scrum Team
- Scrum Team
- One Scrum Master, one Product Owner and Developers. No sub-teams or hierarchies; focused on one objective at a time, the Product Goal. Typically 10 or fewer people. Read the chapter
- Cross-functional
- The team members together have all the skills needed to create value each Sprint. Read the chapter
- Self-managing
- The team decides internally who does what, when and how. Replaced 'self-organizing' in the 2020 Scrum Guide. Read the chapter
- Accountability
- Scrum defines three accountabilities — Developers, Product Owner and Scrum Master — rather than job titles. Read the chapter
- Developers
- Everyone committed to creating any aspect of a usable Increment each Sprint. They create the Sprint Backlog, adhere to the Definition of Done, adapt the plan daily and hold each other accountable. Read the chapter
- Sprint Backlog
- The Sprint Goal (why), the selected Product Backlog items (what) and the plan for delivering the Increment (how). A plan by and for the Developers, updated throughout the Sprint. Read the chapter
- Definition of Done
- The formal description of the state of the Increment when it meets the required quality measures. The commitment for the Increment; undone work can't be released or presented. Read the chapter
- Holding each other accountable
- A Developer accountability: team members hold each other to professional standards, rather than relying on a manager to do it. Read the chapter
- Product Owner
- One person accountable for maximizing the value of the product, through effective Product Backlog management. The only one who can cancel a Sprint. Read the chapter
- Product Goal
- A future state of the product the team plans against; the commitment for the Product Backlog. One Product Goal at a time — fulfilled or abandoned before the next. Read the chapter
- Product Backlog management
- Developing and communicating the Product Goal, creating and communicating items, ordering them, and keeping the Product Backlog transparent, visible and understood. Read the chapter
- Stakeholders
- People with an interest in the product. They influence the Product Backlog through the Product Owner and collaborate with the team at the Sprint Review. Read the chapter
- Scrum Master
- Accountable for establishing Scrum as defined in the Scrum Guide and for the Scrum Team's effectiveness. Serves the team, the Product Owner and the organization. Read the chapter
- True leaders who serve
- How the Scrum Guide describes Scrum Masters: leading by serving the Scrum Team and the wider organization, not by commanding. Read the chapter
- Impediment
- Anything blocking the team's progress that it can't easily resolve itself. The Scrum Master causes its removal — often by helping the team solve it. Read the chapter
- Scrum Team effectiveness
- The Scrum Master is accountable for it, by enabling the team to improve its practices within the Scrum framework. Read the chapter
Scrum Events
- Sprint
- A fixed-length event of one month or less that contains all the other events. A new Sprint starts immediately after the previous one ends. Read the chapter
- Timebox
- A maximum duration. For a one-month Sprint: Sprint Planning 8 h, Daily Scrum 15 min (always), Sprint Review 4 h, Sprint Retrospective 3 h. Read the chapter
- Sprint cancellation
- Only the Product Owner can cancel a Sprint, and only when the Sprint Goal becomes obsolete. Read the chapter
- Sustainable pace
- Working at a pace the team can keep up indefinitely, rather than through constant overtime. Read the chapter
- Sprint Planning
- Starts the Sprint. The whole Scrum Team plans why the Sprint is valuable, what can be Done and how. Max 8 hours for a one-month Sprint. Read the chapter
- Sprint Goal
- The single objective for the Sprint; the commitment for the Sprint Backlog. Set in Sprint Planning and fixed during the Sprint, with flexibility in the exact work. Read the chapter
- Forecast
- The Developers' selection of work for the Sprint, based on past performance, capacity and the Definition of Done — not a guarantee. Read the chapter
- Capacity
- How much work the Developers can take on in the upcoming Sprint, considered when they select items in Sprint Planning. Read the chapter
- Daily Scrum
- A 15-minute event for the Developers to inspect progress toward the Sprint Goal and adapt the Sprint Backlog, every working day at the same time and place. Read the chapter
- Actionable plan
- The output of the Daily Scrum: a plan for the next day of work toward the Sprint Goal. Read the chapter
- Re-planning
- Developers can adjust their plan at any time, not only at the Daily Scrum, as they learn more during the Sprint. Read the chapter
- Sprint Review
- Inspects the outcome of the Sprint with key stakeholders and decides future adaptations. A working session, not a sign-off. Max 4 hours for a one-month Sprint. Read the chapter
- Working session
- How the Sprint Review should run: collaboration on what to do next, not just a presentation. Read the chapter
- Key stakeholders
- The people invited to the Sprint Review to inspect the Increment and help decide what to do next. Read the chapter
- Sprint Retrospective
- Plans ways to increase quality and effectiveness by inspecting individuals, interactions, processes, tools and the Definition of Done. Concludes the Sprint; max 3 hours. Read the chapter
- Continuous improvement
- Improving the way of working all the time. The Retrospective is the formal opportunity, but improvement can happen whenever it helps. Read the chapter
- Improvement action
- A change chosen in the Retrospective. The most impactful are addressed as soon as possible and may be added to the next Sprint Backlog. Read the chapter
Artifacts and Commitments
- Product Backlog
- An emergent, ordered list of what is needed to improve the product — the single source of work for the Scrum Team. One per product. Read the chapter
- Product Backlog refinement
- An ongoing activity of breaking down and adding detail (description, order, size) to items. Not an event; the Developers size the items. Read the chapter
- Product Backlog item
- A single entry in the Product Backlog. Its format is up to the team; user stories are one popular option. Read the chapter
- Ready for selection
- A Product Backlog item that can be Done by the team within one Sprint, so it can be selected in Sprint Planning. Read the chapter
- Sprint Backlog
- The Sprint Goal (why), the selected Product Backlog items (what) and the plan for delivering the Increment (how). A plan by and for the Developers, updated throughout the Sprint. Read the chapter
- Sprint Goal
- The single objective for the Sprint; the commitment for the Sprint Backlog. Set in Sprint Planning and fixed during the Sprint, with flexibility in the exact work. Read the chapter
- Negotiating scope
- When work turns out different than expected, the Developers and Product Owner adjust the Sprint Backlog's scope without affecting the Sprint Goal. Read the chapter
- Increment
- A concrete stepping stone toward the Product Goal: usable, verified and additive to all previous Increments. Born the moment an item meets the Definition of Done. Read the chapter
- Definition of Done
- The formal description of the state of the Increment when it meets the required quality measures. The commitment for the Increment; undone work can't be released or presented. Read the chapter
- Releasing value
- An Increment may be delivered before the Sprint ends. The Sprint Review is never a gate to releasing value. Read the chapter
The Scrum Master in Practice
- Coaching
- Asking questions that help people find their own answers — a core Scrum Master stance for building self-management. Read the chapter
- Facilitation
- Helping a group reach its outcome — in an event or discussion — without deciding for it. Read the chapter
- Teaching
- Explaining Scrum theory and practice when people don't yet understand it. Read the chapter
- Mentoring
- Sharing one's own experience to help someone grow. Read the chapter
- Multiple Scrum Teams
- Teams working on the same product share one Product Goal, one Product Backlog and one Product Owner, and the same Definition of Done. Read the chapter
- Integrated Increment
- One usable Increment combining the work of all teams on a product each Sprint; without it, transparency is lost. Read the chapter
- Shared Definition of Done
- When several teams work on one product, they must mutually define and comply with the same Definition of Done. Read the chapter
- Dependencies
- Work that relies on other work or teams. Reduced by ordering and splitting Product Backlog items and coordinating as often as needed. Read the chapter
- Complementary practices
- Useful practices that aren't part of Scrum, such as user stories, story points, velocity, burndown charts and a Definition of Ready. Read the chapter
- Velocity
- A team's own measure of work completed per Sprint, used for forecasting. Not in the Scrum Guide, and not comparable between teams. Read the chapter
- Burndown chart
- A chart of remaining work over time. A complementary forecasting practice; Scrum doesn't require it. Read the chapter
- User stories
- A popular format for Product Backlog items ('As a…, I want…, so that…'). Optional in Scrum. Read the chapter
- Story points
- A relative sizing unit some teams use. Optional; the Scrum Guide only says the Developers size the work. Read the chapter
- Definition of Ready
- A checklist some teams use before selecting items. Not part of Scrum — the Guide only says items that can be Done within one Sprint are ready for selection. Read the chapter
CAPM key terms
Project Management Fundamentals and Core Concepts
- Project
- Temporary work that creates a unique result. Distinguishes from operations (ongoing, repetitive) — a core first-question distinction on the exam. Read the chapter
- Program
- A group of related projects managed together for combined benefits unavailable from managing them separately — not just 'a big project.' Read the chapter
- Portfolio
- Projects, programs and other work grouped to meet a strategic business goal. Broader than a program; organized around strategy, not relatedness. Read the chapter
- Operations
- Ongoing, repetitive work — keeping things running, not creating something new. The opposite pole from 'project' in CAPM's first distinction. Read the chapter
- Predictive approach
- Plans the work in detail up front and executes to that plan. Fits stable, well-understood requirements and hierarchical structures best. Read the chapter
- Adaptive approach
- Plans in short cycles and adjusts as the team learns. Fits evolving requirements and flatter, faster-deciding structures best. Read the chapter
- Issue
- A problem that has already happened and needs a decision now — distinct from a risk, which hasn't happened yet and may never happen. Read the chapter
- Risk
- An uncertain future event that may or may not occur. If it's already happened, it's an issue, not a risk. Read the chapter
- Assumption
- Something believed true without proof. Needs validating — don't confuse with a constraint (a limit) or a risk (an uncertainty). Read the chapter
- Constraint
- A limiting factor on your project's options (budget, timeline, resources). Should be respected unless formally changed, not ignored when inconvenient. Read the chapter
- Project management plan
- Describes how the project itself will be managed — schedule, cost, risk, communication. Distinct from the product management plan. Read the chapter
- Product management plan
- Describes the product being built and its lifecycle. Answers a different question than the project management plan. Read the chapter
- Milestone
- A significant point in time with zero duration — not a span of effort. 'The milestone takes two weeks' is always a contradiction. Read the chapter
- Risk register
- Documents identified risks, their owners, and planned responses. A living document, actively maintained, not created once and filed away. Read the chapter
- Stakeholder register
- Documents who stakeholders are and their interest/influence. Check it first when a stakeholder-engagement question comes up. Read the chapter
- Project closure
- Includes transitioning the result to operations, releasing resources, and capturing lessons learned — not just shipping the deliverable. Read the chapter
- Project sponsor
- Champions the project, secures funding, and removes organizational-level obstacles the PM can't clear alone. Read the chapter
- Project manager
- Runs the day-to-day — planning, coordinating, delivering — playing several situational roles: initiator, negotiator, listener, coach, working member, facilitator. Read the chapter
- Leadership vs. management
- Management plans/organizes/controls toward defined objectives; leadership inspires and sets direction, often without formal authority. Read the chapter
- Emotional intelligence (EQ)
- Recognizing and managing your own emotions and reading others'. Tested as a practical skill — noticing and addressing team friction constructively. Read the chapter
- Communication plan
- Defines who needs what information, when, and how. Deviating from an agreed plan should be deliberate and documented, not quiet. Read the chapter
- Risk response strategy
- A planned reaction to an identified risk, prepared in advance — distinct from a workaround, which is improvised on the spot. Read the chapter
- Benefit planning
- Being explicit about what business value a project should deliver and how that value will be measured — paired with project initiation. Read the chapter
- Project initiation
- The point a project is formally authorized to begin, typically marked by a charter. Read the chapter
- Stand-up meeting
- Short, frequent, focused on progress and blockers — not a forum for deep design discussion. The classic 'wrong tool' exam scenario misuses it for that. Read the chapter
- Focus group
- Gathers targeted stakeholder or customer input on a specific question — a smaller, more targeted tool than a survey. Read the chapter
- Brainstorming
- Generates a wide range of new ideas quickly, deferring judgment. Misused when a team reaches for it to retrieve one already-known answer. Read the chapter
- Meeting effectiveness
- Judged by clear purpose, the right people, and a recorded decision or output — not by attendance or duration alone. Read the chapter
Predictive, Plan-Based Methodologies
- Predictive approach
- Plans the work in detail up front and executes to that plan. Fits stable, well-understood requirements and hierarchical structures best. Read the chapter
- Organizational structure
- Virtual, co-located, matrix, or hierarchical. Predictive approaches tend to fit hierarchical structures better; adaptive fits flatter ones better. Read the chapter
- Process
- A predictive-project grouping of activities (e.g., planning, executing). Each process has typical, recognizable activities within it. Read the chapter
- Project component
- A distinct piece of the project plan (scope statement, schedule, budget) — each answers a different question and is managed separately. Read the chapter
- Critical path method (CPM)
- Finds the longest sequence of dependent tasks through the project — the critical path — which sets the minimum possible duration. Read the chapter
- Schedule variance (SV)
- SV = EV − PV. Positive means ahead of schedule, negative means behind. One of the exam's most reliable calculation questions. Read the chapter
- Work breakdown structure (WBS)
- Decomposes total scope into smaller pieces down to work packages. Shows everything that must be done — not time or sequence (that's the schedule's job). Read the chapter
- Work package
- The lowest-level WBS piece, small enough to realistically estimate, schedule and assign. Read the chapter
- Quality management plan
- Describes how quality will be managed and verified — without a defined acceptance standard, stakeholders can later disagree over acceptability. Read the chapter
- Integration management plan
- Ties every other piece of the project plan together into one coherent whole, so a scope change is reflected in schedule and budget too. Read the chapter
- Cost variance (CV)
- CV = EV − AC. Positive means under budget, negative means over budget — calculated the same simple way every time. Read the chapter
- Project artifact
- A predictive control document — status report, variance analysis, change log — that lets anyone see whether the project is on track. Read the chapter
- Status report
- Summarizes current progress against the plan. One of the named predictive control artifacts. Read the chapter
Agile Frameworks/Methodologies
- Adaptive approach
- Plans in short cycles and adjusts as the team learns. Fits evolving requirements and flatter, faster-deciding structures best. Read the chapter
- Organizational process assets (OPAs)
- An organization's existing templates, historical data, and lessons learned — can support or conflict with adopting an adaptive approach. Read the chapter
- Enterprise environmental factors (EEFs)
- Broader conditions like culture or marketplace conditions that influence whether an approach (especially adaptive) takes hold. Read the chapter
- Iteration
- A fixed-length, repeatable cycle of planning, building and reviewing a slice of the product. Called a sprint specifically in Scrum. Read the chapter
- Sprint
- Scrum's name for an iteration — a fixed-length cycle with planning, daily check-ins, review and retrospective. Read the chapter
- Backlog
- A living, re-prioritized list of everything that might go into the product, refined close to when items will actually be worked on. Read the chapter
- Adaptive tracking
- Velocity, burndown — reflects incremental, iteration-based progress better than percent-complete against a fixed predictive baseline. Read the chapter
- Product backlog
- The full, prioritized list of everything that might be built — distinct from the sprint backlog's smaller, committed slice. Read the chapter
- Sprint backlog
- The smaller slice of the product backlog committed to the current iteration. Read the chapter
- Burndown chart
- Tracks remaining work against time within the current iteration — shows at a glance whether the team is on pace to finish. Read the chapter
- Increment
- The actual, potentially shippable piece of product produced by the end of an iteration. Read the chapter
- Scrum
- An adaptive framework with fixed-length sprints, defined roles (Scrum Master, Product Owner, Developers), and named events. Read the chapter
- Extreme Programming (XP)
- Shares Scrum's iterative cadence but adds engineering practices: pair programming, test-driven development, continuous integration. Read the chapter
- Kanban
- Continuous flow against a work-in-progress (WIP) limit — no fixed-length iterations, unlike Scrum, XP or SAFe. Read the chapter
- Scaled Agile Framework (SAFe)
- Coordinates many agile teams working toward one larger program or portfolio goal — a scaling framework, not a single-team method. Read the chapter
- Definition of Done
- The team's consistent, shared bar for what 'finished' means for any item — prevents repeated, item-by-item disagreement. Read the chapter
- Acceptance criteria
- Conditions a specific item must meet to be considered satisfied, defined in advance — turns 'is this done?' into a checklist. Read the chapter
- Backlog prioritization
- Weighs business value, risk, and dependencies together — an item that unblocks other work often jumps ahead of a higher-value one. Read the chapter
Business Analysis Frameworks
- Business analyst (BA)
- Understands what the business needs and translates it into requirements the team can build against — distinct from the PM's role. Read the chapter
- Process owner
- Accountable for a business process overall — distinct from the process manager, who runs it day-to-day. Read the chapter
- Process manager
- Runs a business process's day-to-day operation — distinct from the process owner's overall accountability. Read the chapter
- Product owner
- Owns and prioritizes a single Scrum team's backlog — narrower in scope than a product manager's broader strategic ownership. Read the chapter
- Internal vs. external stakeholder
- Internal: employees, internal teams. External: customers, regulators, vendors. Each may need different engagement. Read the chapter
- Communication channel
- Should match the message's scale, audience, and need for discussion vs. a quick update — a workshop and a one-line message solve different problems. Read the chapter
- Status report
- Summarizes current progress against the plan. One of the named predictive control artifacts. Read the chapter
- Stakeholder presentation
- Fits a group decision or discussion moment — a heavier channel than a quick update, lighter than a full detailed document. Read the chapter
- User story
- A short, outcome-focused requirement format ('As a [role], I want [goal], so that [benefit]') — fits adaptive work well. Read the chapter
- Use case
- A detailed, step-by-step description of a user-system interaction, including alternate paths — fits complex or predictive work. Read the chapter
- Requirements traceability matrix (RTM)
- Links each requirement to its source and to the deliverable that satisfies it — the product backlog plays an overlapping role on adaptive projects. Read the chapter
- Stakeholder interview
- A one-on-one gathering method — suits nuanced, individual input better than broad-reach tools like a survey. Read the chapter
- Requirements workshop
- Brings multiple stakeholders together to align on requirements in real time — fits contentious, multi-party trade-offs. Read the chapter
- Product roadmap
- Shows high-level direction and major capabilities over time, release by release — trades detail for a shared forward-looking picture. Read the chapter
- Release plan
- Determines which components go into which release — guided by dependencies and whether each release's theme holds together coherently. Read the chapter
- Release
- A planned delivery point on the roadmap — components that depend on each other must be sequenced into the correct release order. Read the chapter
- BA role in predictive projects
- Typically gathers and documents requirements comprehensively up front, producing specifications the team builds against with limited expected change. Read the chapter
- BA role in adaptive projects
- Works continuously alongside the team, refining and re-prioritizing the backlog as it learns — not a single upfront phase. Read the chapter
- Acceptance criteria
- Conditions a specific item must meet to be considered satisfied, defined in advance — turns 'is this done?' into a checklist. Read the chapter
- Delivery readiness
- Confirming every committed requirement was delivered and verified against its acceptance criteria — not just that development stopped. Read the chapter
- Validation
- Confirming, after delivery, that what was built actually satisfies what was asked — distinct from gathering, which captures what's needed upfront. Read the chapter
PMI-PBA key terms
Needs Assessment
- Problem analysis
- Techniques used to get past a vague complaint and identify the real underlying business problem before any solution is scoped. Read the chapter
- Opportunity analysis
- Parallel to problem analysis, but for a positive opening rather than a pain point — both feed a solution scope statement and business case. Read the chapter
- Solution scope statement
- Bounds what the eventual solution will and won't cover, built directly from the defined business problem or opportunity. Read the chapter
- Business case
- The justification for an initiative — why the organization should invest, grounded in the value proposition a BA helps determine. Read the chapter
- Valuation technique
- Tools like cost-benefit analysis or SWOT used to help determine an initiative's value proposition from collected data. Read the chapter
- Value proposition
- The specific, measurable value an initiative is meant to create — a vague claim with no measurable component can't be evaluated later. Read the chapter
- Cost-benefit analysis
- A valuation technique comparing an initiative's expected costs against its expected benefits to support a funding decision. Read the chapter
- SWOT analysis
- A valuation technique assessing strengths, weaknesses, opportunities, and threats as input to a value proposition. Read the chapter
- Project goals and objectives
- Set collaboratively, with the BA clarifying business needs and solution scope so the product stays aligned with organizational goals. Read the chapter
- Solution scope
- What the eventual solution will and won't cover — established early and checked for alignment throughout Analysis and validation. Read the chapter
- Strategic alignment
- Checking that a project's objectives still map to the organization's broader goals, not just its own narrower stated targets. Read the chapter
- Stakeholder identification
- An ongoing review of goals, objectives, and requirements — not a one-time list — to catch stakeholders whose relevance emerges later. Read the chapter
- Internal stakeholder
- A stakeholder inside the organization — an employee, internal team, or process owner. Read the chapter
- External stakeholder
- A stakeholder outside the organization — a customer, regulator, or vendor — classified by interest/influence, not formal relationship. Read the chapter
- Representation
- Making sure identified stakeholders are actually represented, informed, and involved — not just logged in a register and left there. Read the chapter
- Stakeholder values
- What each stakeholder actually cares about regarding the product, drawn out through elicitation and used as a prioritization baseline. Read the chapter
- Elicitation technique
- A method for drawing requirements out of stakeholders — individual (interviews) or group (workshops), matched to the situation. Read the chapter
- Prioritization baseline
- The documented record of elicited stakeholder values, referenced later whenever competing requirements need to be prioritized. Read the chapter
Planning
- Business case
- The justification for an initiative — why the organization should invest, grounded in the value proposition a BA helps determine. Read the chapter
- Project context
- What reviewing the business case and goals/objectives provides before detailed planning — grounding planning decisions in why the project exists. Read the chapter
- Scope of BA work
- How much formal process a BA's planning and analysis work actually needs — should scale to the business case's real stakes. Read the chapter
- Traceability strategy
- Decided during Planning: how rigorously each requirement will be linked source-to-delivery, scaled to the project's actual risk. Read the chapter
- Requirements traceability matrix (RTM)
- Links every requirement back to its source and forward to its delivery evidence — formal, predictive-style traceability. Read the chapter
- Level of traceability
- How much traceability rigor a given project actually needs — a regulated initiative needs more than a small internal one. Read the chapter
- Requirements management plan
- The operating agreement for a project's BA work: stakeholders, roles, communication protocols, and elicitation/approval methods. Read the chapter
- Roles and responsibilities
- Who is involved in requirements work and in what capacity — defined upfront in the requirements management plan to prevent later disputes. Read the chapter
- Elicitation method
- The specific technique chosen to draw out a requirement — matched to the situation, not defaulted to one method for everything. Read the chapter
- Approval process
- The defined path a requirement follows to be formally approved — should be documented upfront, not improvised mid-project. Read the chapter
- Change control
- The defined channels and processes for submitting, reviewing, and managing requirement change requests. Read the chapter
- Change request channel
- A specific, known intake point for change requests — without one, requests arrive informally and are easy to lose track of. Read the chapter
- Change management plan
- The project's broader change process, into which requirements-specific change control methods feed standard protocols. Read the chapter
- Document control
- Tools and conventions — versioning, approval stamps, a shared repository — that keep a clean, traceable requirements-document history. Read the chapter
- Version control
- Conventions (numbering, approval stamps, a shared repository) that prevent team members from working off diverged document versions. Read the chapter
- Documentation management tool
- A tool used to implement document control, keeping requirements document versions clear and current. Read the chapter
- Business metric
- A measurable, overall target defined collaboratively with stakeholders during Planning — the broader bar the initiative aims for. Read the chapter
- Acceptance criteria
- Specific, measurable conditions a requirement or solution must meet — set broadly during Planning, elaborated item-by-item in Analysis. Read the chapter
- Stakeholder collaboration
- Working directly with stakeholders — not unilaterally — to define business metrics, acceptance criteria, and prioritization. Read the chapter
Analysis
- Elicitation technique
- A method for drawing requirements out of stakeholders — individual (interviews) or group (workshops), matched to the situation. Read the chapter
- Individual elicitation
- Techniques like interviews, observation, or document analysis suited to deep, one-on-one or sensitive input. Read the chapter
- Group elicitation
- Techniques like workshops or focus groups suited to surfacing a wide range of input or resolving disagreement in real time. Read the chapter
- Requirement rationale
- The origin and justification behind a requirement — why it exists — captured alongside the requirement text for later evaluation. Read the chapter
- Dependency analysis
- Examining what relies on what among requirements, used both during decomposition and later allocation/sequencing decisions. Read the chapter
- Interface analysis
- Examining how a system or process connects to and interacts with other systems — prototyping and storyboarding are common techniques. Read the chapter
- Data modeling
- Visualizing how information flows and is structured, used during requirements decomposition to clarify product options. Read the chapter
- Process modeling
- Visualizing how work flows, used during requirements decomposition alongside data and dependency analysis. Read the chapter
- Decision-making technique
- Tools like multi-voting or weighted criteria used to evaluate product options and reach a defensible, structured choice. Read the chapter
- Accepted requirement
- A requirement that evaluation determined belongs in the solution — distinct from deferred (valid, not now) or rejected (doesn't fit). Read the chapter
- Deferred requirement
- A requirement with real merit that doesn't fit the current baseline — stays visible for a future release, not discarded. Read the chapter
- Rejected requirement
- A requirement determined not to fit the solution scope or value proposition — unlike deferred, not expected to be built later. Read the chapter
- Requirements baseline
- The agreed, documented set of requirements a project will actually build against — the output of allocation. Read the chapter
- Allocation
- Deciding which accepted requirements fit the current baseline, balancing scope/schedule/budget/resources against value. Read the chapter
- Prioritization technique
- Tools like weighted criteria or MoSCoW used during allocation to decide which requirements take precedence given constraints. Read the chapter
- Sign-off
- Genuine stakeholder consensus and approval, obtained through decision-making techniques — not a rushed approval with an objection waved off. Read the chapter
- Stakeholder consensus
- Real agreement reached by working through disagreement, not simply approval from whoever happened to be in the room. Read the chapter
- Baseline approval
- See Sign-off — the formal, genuine stakeholder agreement that locks in a requirements baseline. Read the chapter
- Use case
- A detailed, step-by-step interaction between a user and a system, including alternate paths — fits complex or predictive work. Read the chapter
- User story
- A short, outcome-focused requirement format ('As a..., I want..., so that...') — fits adaptive work and simpler requirements. Read the chapter
- Requirements specification
- The written, buildable form of a requirement — process detail (use case/user story), data detail, and interface detail together. Read the chapter
- Measurable requirement
- A requirement specific enough that two people can't reasonably disagree about what it means — the real bar 'actionable' requires. Read the chapter
- Requirements validation
- Checking written requirements for completeness, accuracy, and alignment with goals/objectives/value proposition before development. Read the chapter
- Prototype
- A concrete artifact stakeholders can react to, often surfacing misalignment earlier than a written description alone. Read the chapter
- Demo
- A live walkthrough used to validate requirements, letting stakeholders react to something tangible before full development. Read the chapter
- Documentation review
- A validation method suited to textual or process-based requirements where a visual demo wouldn't add significant clarity. Read the chapter
- Detailed acceptance criteria
- Item-level, specific conditions elaborated during Analysis — more granular than Planning's broader business metrics. Read the chapter
- Measurement tool
- A technique (such as a service level agreement) used to specify detailed, measurable acceptance criteria for a requirement. Read the chapter
- Given-when-then
- A format for writing precise, testable acceptance criteria: a triggering condition and an expected, checkable outcome. Read the chapter
Traceability and Monitoring
- Traceability artifact
- A tool (often an RTM) that records a requirement's status, sources, and relationships — maintained on an ongoing basis. Read the chapter
- Requirement status
- A requirement's current lifecycle state — needs to be kept genuinely in sync with reality, not left stale in the tracking tool. Read the chapter
- Requirement dependency
- A relationship where one requirement relies on another — captured during tracking and critical to later change-impact assessment. Read the chapter
- Requirement lifecycle
- The stages a requirement moves through — elicited, analyzed, approved, built, tested, delivered — tracked toward a definite closure. Read the chapter
- Supporting artifact
- A model, document, or test case expected at a specific lifecycle stage — a requirement can look 'on track' while one is quietly missing. Read the chapter
- Lifecycle monitoring
- Checking that required supporting artifacts (models, documentation, test cases) exist and are approved at each lifecycle stage. Read the chapter
- Lifecycle state
- A requirement's specific point in its lifecycle — updates should be both recorded in the tool and communicated to stakeholders. Read the chapter
- Status update
- Recording a requirement's new lifecycle state and communicating it — a status change without communication misses the point. Read the chapter
- Closure
- A requirement reaching a definite final lifecycle state — delivered and verified, or formally withdrawn — rather than lingering ambiguously. Read the chapter
- Status communication
- Proactively informing the project manager and stakeholders of requirements issues, conflicts, changes, risks, and overall status. Read the chapter
- Requirements issue
- A problem with a requirement needing communication and resolution — distinct from simply logging it and hoping someone checks. Read the chapter
- Requirements risk
- A potential problem affecting requirements that needs proactive, not just logged, communication to the project manager. Read the chapter
- Change impact assessment
- Evaluating a proposed change's impact, dependencies, and risk against the change control plan before it's approved. Read the chapter
- Requirements baseline comparison
- Comparing a proposed change against the existing baseline to understand exactly what would actually change. Read the chapter
- Requirements integrity
- Keeping a requirement and every associated artifact consistent after a change — nothing left half-updated or out of sync. Read the chapter
Evaluation
- Test evidence
- Actual test results, reports, and other proof reviewed against acceptance criteria to determine whether a solution satisfies requirements. Read the chapter
- Acceptance criteria validation
- Checking actual test results and evidence against documented acceptance criteria — not accepting a developer's word alone. Read the chapter
- Solution satisfaction
- Whether the solution genuinely satisfies its requirements, confirmed through validated test evidence, not assumption. Read the chapter
- Gap analysis
- Analyzing a solution's identified gaps and deltas using QA tools, to enable stakeholders to resolve discrepancies. Read the chapter
- Delta
- The specific, measurable difference between what was required and what was actually delivered, surfaced during gap analysis. Read the chapter
- Quality assurance tool
- A method used specifically to analyze a solution's gaps and deltas against requirements — not informal, undocumented conversation. Read the chapter
- Solution sign-off
- Formal stakeholder agreement that the developed, validated solution is ready — the gate that enables proceeding with deployment. Read the chapter
- Deployment decision
- The decision to proceed with deployment, enabled by (and only after) genuine stakeholder sign-off on the developed solution. Read the chapter
- Post-deployment evaluation
- Checking the deployed solution against the original business case and value proposition, not just individual requirements. Read the chapter
- Business case comparison
- Measuring a deployed solution's actual results against what the original business case promised — where real value gaps surface. Read the chapter
- Value proposition realization
- Whether the value an initiative promised during Needs Assessment actually materialized after deployment. Read the chapter